KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
' style=
Date:  6-23-2016
Number of Hours:  4.00
Manual Reference:  
Brief Description:  Construction of Canopy Frame

Finished up the front latching system of the canopy. I had to shape/sand the tips of the rods that move over the frame for the perfect seat and height. Took longer than expected!

Therafter I studied the plan for the rear latch of the canopy. Checked wether I have all the materials on stock. Will start with the actual manufacturing tomorrow I guess.
' style=





' style=










Copyright © 2001-2024 Matronics. All Rights Reserved.